If you own — or are shopping for — a waterfront home in South Florida, your seawall already has a number attached to it. Not its age, and not its condition: its legal minimum height, set by the city it sits in. Florida has no statewide seawall height. The rule is written city by city, which means two houses on the same canal can answer to different numbers the moment a city line crosses the water. This page collects the coded requirements for the cities I work every day, explains the two ideas that make the numbers make sense (the Broward regional standard and the survey datum), and closes with what the rules mean when you're buying or selling.
On March 31, 2020, Broward County adopted a regional resilience standard for seawalls (County Code Ch. 39, Art. XXV): a minimum cap height of 5 feet NAVD88. The standard carries a long transition window — a wall at 4 feet remains acceptable on applications filed before January 1, 2035, provided the wall is designed so it can be raised to 5 feet by January 1, 2050. Cities inside the county adopted their own versions of the standard, and several adjusted the details — which is where the local differences below come from.
City | Height rule (NAVD88) | Code
Lighthouse Point — 4.0 ft minimum cap; owners may build to 5.0 ft — Sec. 42-381
Pompano Beach — Between 5 ft and 5 ft 10 in; no 4 ft option — Sec. 151.05
Deerfield Beach — 5 ft, or 4 ft before 2035 if built to reach 5 ft by 2050 — LDC Sec. 98-87
Fort Lauderdale — 5 ft (4 ft before 2035 on the same terms), and no higher than the base flood elevation or 6 ft, whichever is lower — ULDR Sec. 47-19.3
Lauderdale-by-the-Sea — 5 ft, or 4 ft before 2035 if built to reach 5 ft by 2050; applies to attached docks as well — Ord. 2022-01
Sea Ranch Lakes — 5 ft, or 4 ft before 2035 if built to reach 5 ft by 2050 — Sec. 6.01.06
Hillsboro Beach — 5 ft, with no 4 ft step; the cap must be able to rise a further 24 inches — Sec. 12-268
Boca Raton — Code calls for +5.00 ft (no datum named); city engineering standards run 4.0–6.0 ft, with room to add 12–18 inches later — City code & design standards
Delray Beach — 4.2 ft on most floodplain lots, designed to extend to at least 5 ft — LDR Sec. 7.1.7
Miami Beach — 5.7 ft for new walls and substantial improvements; 4 ft only if designed to support a future 5.7 ft — Sec. 54-62
Three local facts worth pausing on. Pompano Beach is the strictest city in Broward — it skipped the 4-foot transition entirely and holds every wall to a band, not just a floor. Lighthouse Point is the outlier in the other direction, with the county's lowest minimum — a deliberate local choice in a city of low, wide canals. And Fort Lauderdale pairs its floor with a ceiling: a wall may not rise above the base flood elevation or 6 feet, whichever is lower, so "higher is better" is not automatically legal there.
North of the county line there is no regional standard at all. Boca Raton and Delray Beach write their own rules, as the table shows, and several Palm Beach County cities — Boynton Beach, Lantana, West Palm Beach among them — have no coded height at all, which makes the engineer's design choice, and the neighboring walls, the de facto standard.
Nearly every figure above is stated in NAVD88, the modern survey datum. A few Florida cities still write their rules on the older NGVD 1929 datum — Coral Gables and Stuart among them — and in Miami-Dade the two datums sit about 1.5 feet apart. A "6-foot wall" on one datum is not the same wall on the other. Before comparing any two numbers, and certainly before designing to one, have the engineer state the cap height in NAVD88 and in the city's own datum, in writing, so the plans, the survey, and the permit all agree.
These heights govern new walls — and, quietly, a great many repairs. Most local codes treat work as substantial once it crosses roughly half the shoreline's length or half the wall's replacement cost, and substantial work brings the entire wall up to the current standard. Fort Lauderdale applies that test explicitly; Oakland Park uses a similar 50 percent rule; Pompano Beach raises the whole shoreline when a below-5-foot wall is substantially repaired. The practical consequence: a modest repair quote on an older, lower wall can lawfully become a full-height replacement project. Knowing where your wall stands against your city's number — before you call for the repair quote — is the difference between planning that project and being surprised by it.
Buying waterfront: add one line to your due diligence — the seawall's surveyed cap height, against the city's coded requirement. A wall that meets its number is an asset that transfers cleanly. A wall below it is a future capital project with a trigger attached, and it belongs in the price conversation during the inspection period, not after closing. This is doubly true on teardown and development purchases, where the wall is often the one structure meant to survive: in Miami Beach, for example, a site plan that keeps an existing 4-foot wall will still have to show how that wall reaches 5.7 feet.
Selling waterfront: if your wall is new, or documented at or above your city's requirement, say so in the listing — with the permit. Buyers from markets without these rules rarely think to ask, and a compliant wall answers one of their largest unspoken costs. One of my current Pompano Beach listings carries a brand-new seawall and dock built inside the city's 5 ft–5 ft 10 in band; it is consistently the first thing sophisticated buyers ask about.
Watching the water: these minimums exist because South Florida's highest tides — the King Tides each fall — already test them. If you want to see what a given height means on a real street, my King Tides and flooding guide walks through the local pattern season by season.
Almost certainly not. Existing walls are generally lawful as built; the coded height binds new construction and substantial repairs. The number matters at your next project, your next permit — and your next sale, when a buyer's inspector measures it.
Sometimes — but not everywhere. Fort Lauderdale caps walls at the base flood elevation or 6 feet, and several Gulf-coast cities regulate maximums rather than minimums to protect neighbors' views and drainage. Higher also changes how water behaves on your lot and your neighbors'. Design to the code, with the future-raise capacity the codes increasingly ask for.
Your surveyor, against the city's code section — the table above gives the section to hand them. It is a short, inexpensive check relative to everything else riding on the answer.
Sources: Figures compiled from city codes (compilation by Seawall & Dock, last checked November 4, 2026; county standard: Broward County Regional Resilience Standard, Ch. 39 Art. XXV). Codes change — confirm the current figure with your city's building department before designing or contracting work.
Reed Kellough is a Florida-licensed real estate agent (Douglas Elliman / Eklund|Gomes) based in Lighthouse Point, specializing in South Florida waterfront homes — 200+ closings over 14 years. Moving from outside Florida? Reed maintains a national network of vetted relocation specialists and referral partners, and can connect you with the right agent anywhere in the country.